SULACO MMC Consulting & Engineering Co. is an enlarged and reformed continuation of the group of experts from different research and design- based institutes of Water Supply, Sewerage and Construction in 1998.Sensitive to changes in our business environment, SULACO MMC has recognized the altered needs of clients and implemented a merger, expanded resource base with new partnerships, and restructured our range of services.

Our Projects

  • Feasibility studies for Rehabilitation of Baku Sewage System, Azerbaijan Republic (December 1998- April 1999);
  • Technical Assistants for Supervision of the Construction of Neftchala Sturgeon Hatchery, its Initial Operation and Training of Operators (February 1999- October 2003);
  • Environmental Assessment and Monitoring in the Project Areas of the Samur-Apsheron Canal and Main Mil Mugan Collector (May- September 1999);
  • Master Plan on Integrated Environmental Management - Development of the Nature Conservation System (April 2000-June 2000);
  • Technical Assistance for Development of Hazardous Waste Management System (July 2000 – April 2002);
  • Baku Port Development Project Ferry Terminal Reconstruction Project is financed from EBRD, under TASIS Program (May 2001- January 2002);
  • Implementation of Pilot Projects for the Treatment of Oil Contaminated Sediments and Sludge by in Site Bioremediation (February – September 2002);
  • Rehabilitation and Completion of Irrigation and Drainage Infrastructure Project (Samur-Apsheron Canal and Mil-Mugan Collector) / Supervision of work and preparation of tender documents for SAC 50 km and MMMC – 31 km. (February 2002- June 2006);
  • Project of Preparation of Design and Tender Documentation on Construction of Irrigation Water Pipe and Pumping Stations, rehabilitation and Sinking of Drinking Water Wells, Rehabilitation of Drainage Canals for IDPs Communities (February 2002- March 2002);
  • Consulting Services for Appraisal of Micro-projects (August 2002- July2003);
  • The Technical Assistance on Preparation of Long Term Strategy and Feasibility Study for the Samur – Apsheron Canal (SAC) System (August 2003- August 2004);
  • Designing of school buildings for IDPs in Absheron, Agjabedi, Barda rayons and Surakhani District of Baku City (November 2003-March 2004);
  • Feasibility Study for Provision with Water Supply and Sewage Services by Private Sector in Greater Baku (July 2003);
  • Sector studies on power branch in Azerbaijan (March 2004- August 2004)
  • Yevlakh-Ganja Highway Rehabilitation Project (October 2004-December 2004);
  • Repair/construction works in Azerbaijan Teachers Institite’s affiliates in Salyan, Jalilabad, Mingechevir and Samakha rayons (February 2005 – June 2005);
  • Preparation of Final Report on Pilot Rehabilitation Project Assessment for Rehabilitation and Reconstruction of Azerbaijan suffered Areas (04.2005–07.2005);
  • Social Infrastructure for Internally Displaced Persons and Vulnerable Population Project (April 2005-August 2005);
  • The Project is implemented by order of ADB."Preparation of detailed engineering designs including estimate and tender documentation for repair and new construction works in someschools of Ali- Bayramli town”, (October 2005- January 2006);
  • Rehabilitation and Reconstruction of the Azerbaijan Railway, (May, 2006- April, 2008);
  • “Gaz-chemical investigations in the area of city landfill located near Balakhany settlement in Baku city”, (May 2007- July 2007);
  • “Environmental Impact Assessment on the "Project for Depuration and Rehabilitation of Ramany and Surakhany Production Sites of Baku Iodine Plant" within the World Bank’s Absheron Rehabilitation Program” , (October 2007- March 2008);
  • “Rehabilitation and Modernization of Bahramtapa Headwork”, (May 2007- July 2009);
  • “Topographic Survey & Preliminary Geological Survey Works in Gyzyldash Cement Plant Site”, (December 2008- February 2009);
  • “Topographic Survey on the Balakhan landfil in Baku”(April 2009- September 2009);
  • “Design and Construction Supervision for the Rehabilitation and Modernization of On-Farm and Off-Farm Infrastructure”, (April 2006- February 2010);
  • Repair/construction works and Construction Supervision for internal Amelioration and Irrigation networks in the areas of the Selected Water Users Associations (WUA) within the “Modernization of Water Distribution System and Managing Project” (April 2006- February 2010);
  • “Social Impacts Assessment under Gizildash-Cement Plant Project”, (October, 2009- January, 2010)
  • «Construction and Technical Supervision of Winery Plant Construction in Gabala Region, Azerbaijan Republic» (January 2010- March-2011);
  • Design and Construction Supervision for the Rehabilitation and Modernization of On-Farm and Off-Farm Infrastructure”, (May 2010- September 2010);
  • “Azerbaijan 2nd National Water Supply and Sanitation Project “Preparation of Feasibility Study of Water Supply and Wastewater Investments and Construction Supervision in 16 rayons”, (March 2010- April 2011);
  • “Feasibility Study for Upgrading Water Intake Structures at Northern Rivers and Improvement of Absheron Main Canal for Irrigation In Azerbaijan - Environment Impact Assessment” (June 2010 - October 2010);
  • Research of Technical Condition and Feasibility Study of Rehabilitation of Dormitories and Public Buildings Project (July 2011- November 2011);
  • “Second National Water Supply and Sanitation Project, including Design for 16 rayons and Construction Supervision and Administrative Support in 8 rayons” (March 2010 – March 2015).
  • “Design and Construction Supervision for the Rehabilitation and Modernization of On-Farm and Off-Farm Infrastructure” (May 2011 – May 2016).
  • «Construction and Technical Supervision of Glass Plant Construction in Sumgayit City, Azerbaijan Republic (June 2011- August 2012);
  • “Integrated Solid Waste Management Project (ISWMP) Consulting Services for Supervision of Works at Balakhani Landfill and other sites” (October 2011 – October 2015).
  • “Monitoring of environmental quality during the site preparation for construction of PP/HDPE SOCAR Polymer LLC plant” (March 2015 – June 2016).
  • “Environmental and Social Impact Assessment of construction of PP/HDPE SOCAR Polymer LLC plant” (July 2015 – December 2015).”
  • “Implementation of engineering-geological, geophysical and geotechnical investigations on the construction site of SOCAR GPC oil and gas processing complex in Garadag district of Baku City (Puta settlement)” (June 2016-December 2016).
  • “Implementation of engineering-geological, geophysical and geotechnical investigations on the construction site of SOCAR GPC oil and gas processing complex in Garadag district of Baku City (Sangachal settlement)” (March 2017 - October 2017).
  • “Environmental and Social Impact Assessment of “SOCAR GPC” oil and gas Processing Complex in Garadag district of Baku City” (November 2017 – March 2018).
  • “Socar Polymer” MMC; “Engineering and environmental surveys on theland plot intended for the parking of the PP and YASPE plant in Sumgayit, Client: Socar Polymer LLC, (January 2019);
  • Environmental and Social Impact Assessment Project for the Finished Pharmaceuticals Plant Project located in Pirallahi Industrial Park, Pirallahi District, Baku, Client: R-Farm Company, (March 2018 - May 2018);
  • Environmental and Social Impact Assessment of the Mingachevir CageFisheries Project, Client: "Azerbaijan Fish Farm LLC, (December 2019 - January 2020);
  • Environmental and Social Impact Assessment for the Gabala Goldfish Breeding Project in Chukhur Gabala District, Gabala District, Client: "Azerbaijan Fish Farm" LLC, (February 2020 - April 2020);
  • “Azerbaijan Fish Farm” MMC; Environmental and Social Impact Assessment of the Trout Exploration Project in Magov Village, Zagatala District, Client: Azerbaijan Fish Farm LLC, (May 2020 - June 2020);
  • Environmental and Social Impact Assessment for the Caspian SturgeonBreeding Project in Shirvanly Village, Neftchala District, Client: "Azerbaijan Fish Farm, LLC (July 2020 - August 2020);
  • “Azerbaijan Fish Farm” MMC. Center for assessing the impact on the environment and social environment of the project "Kura- experimental fish hatchery named. S.G. Karimov ", located in the village of Yenikend,Neftchala region. Client: "Azerbaijan Fish Farm" LLC (September 2020 -October 2020);
  • Environmental Impact Assessment for EVX to be built from Gobustan settlement to Shirvan city for the 230 MW Solar PV Power Plant projectClient: Italian company Wood, (September 2021 - October 2021);
  • Environmental and Social Impact Assessment for the 230 MW Solar Photovoltaic Project near Gobustan settlement, Garadagh district, BakuClient: Masdar Company of the UAE, (April 2021-November 2021);
  • Environmental Impact Assessment of the Almond Processing Project inTurkan Village, Khazar District, Baku Client: PMD Projects LLC, (June 2021 - August 2021).
  • Project ADB.TA9945-AZE: Preparing Irrigation and Drainage System Development in Nakhchivan Autonomous Republic Project. Environmental Study (IEE & EMP) with Agriculture Survey. Client: Sofreco (France) (May – September 2022);
  • Masdar – Azerbaijan - Solar energy project Area 60 in Azerbaijan. Geotechnical exploration and topographic surveys at the power plant construction site. Client: “DONGFANG ELECTRIC AZ LIMITED” LLC (June – October 2022).

Our Awards

Dekko-description
Dekko-description
Dekko-description
Dekko-description

Our Licence

License for design of buildings and structures (special permission)

Dekko-description

Contact Us